Print this page Tell A Friend Add to Favorites
Subscribe

Peel Region - Zone 5 Sub Transmission Main

PROJECT DESCRIPTION

This project involves the east to west connection of two parallel water systems in the Region of Peel to allow water transportation in the event of a disruption to one of the two systems. The east-west connection provides security for repair or maintenance measures, increased capacity and optimal connection for future growth in that area.

SCOPE OF SERVICES

For the Region of Peel, The Municipal Infrastructure Group Ltd. is currently providing full engineering services to complete a Schedule "C” Class Environmental Assessment, preliminary design and hydraulic and transient analysis for the connection of two parallel water systems in West Brampton.

PROJECT HIGHLIGHTS

The sub-transmission main will be constructed through existing built-up areas within the City of Brampton. A comprehensive Communications Plan is being implemented to ensure all stakeholders are engaged.

PROJECT DETAILS


CLIENT: Region of Peel
LOCATION: Brampton, Ontario, Canada
DURATION: 2011-Ongoing
ENGINEERING FEES: $ 700,000
CONSTRUCTION EST.: Approx. $ 40 Million