PROJECT DESCRIPTION

This project involved the abandonment of an existing 150-200 mm diameter cast iron watermain along Main Street between Knox Street and approximately 450m north of Wallace Street, along an urban section of Highway 7 (Main Street) as well as a rural section. Cathodic protection has been added to the existing 300 mm diameter watermain through the urban section and a new 300 mm PVC watermain was installed approximately 450m north of Wallace Street to connect to an existing 300 mm diameter PVC watermain along the rural section. All water services connections and hydrant connections were transferred to either the existing 300 mm ductile iron watermain or new 300mm PVC watermain.

SCOPE OF SERVICES

For Halton Region, The Municipal Infrastructure Group Ltd. provided full engineering services including preliminary design, detailed design, tender period assistance and contract administration for the installation of the new watermain and cathodic protection on the existing watermains.

PROJECT HIGHLIGHTS

The area in question involved a section of Hwy 7 through Acton which is a well travelled road. The work has been implemented while maintaining safe and adequate traffic control and while maintaining water service to existing residents, institutions and businesses.

PROJECT DETAILS


CLIENT: Halton Region
LOCATION: Acton, Ontario, Canada
DURATION: 2011 - 2012
ENGINEERING FEES: $68,000
CONSTRUCTION EST.: $680,000
 